All Topics |
Topic: “Reservoir - "Start Year"?”
| Author | Message |
|---|
|
Subject: Reservoir - "Start Year"?
Posted: 11/11/2025 Viewed: 55 times
Hello everyone:
I'm following all the steps in the Spanish and English tutorial for the WEAP program, and I have a question about the Reservoir element. The English and Spanish tutorials mention that it's possible to add the "Start Year" (in fact, the example mentions that 2022 should be considered the start year), but I haven't been able to find that option in the latest version of WEAP. I assume it's no longer available, right? Or perhaps there's a similar option where I can specify a start year? |
|
Subject: Re: Reservoir - "Start Year"?
Posted: 11/11/2025 Viewed: 36 times
Reynner,
In the schematic, right click on your reservoir and uncheck the box next to "Active in Current Accounts?" Then, you should be able to set the start year. Cheers, Doug |
|
Subject: Re: Reservoir - "Start Year"?
Posted: 11/12/2025 Viewed: 29 times
Doug,
Thanks for your reply. You're absolutely right, the mistake was omitting the "Activate basin currents" step. I was misled by the image in the Spanish tutorial (page 103), but the reference is clear in the English version (pag 98). Thank you so much for your support. |
Topic: “Reservoir - "Start Year"?”