Welcome to WEAP's Website
WEAP
WEAP este initiativa Stockholm Environment Institute.


Despre WEAP

Acasa
De ce WEAP?
Caracteristici
Ce e nou?
Imagini Captate ale Modelului
Demonstratie
Aplicatii
Publicatii
Istorie si Contributii

Utilizare WEAP
Download
Licenta
Ghid De Folosire
Tutoriale
Video
Resurse

Forum Utilizatori
Discutii
Lista Membrii
Editare Profil

Suport Aditional
Instruire
Cursuri Universitare
Colaborare

Despre Noi
Programul privind Resursele de Apa SEI-US
Va rugam sa ne contactati

 Stiri Mediu
LEAP Interesat de Energie?
Citeste despre LEAP: Programul SEI pentru planificarea energiei.

Forum Utilizatori

All Topics | Topic "Diversion"
Log in to post new messages or reply to existing messages.
 
Author Message
laleh Mahmoudian

Subject: Diversion   
Posted: 4/19/2010 Viewed: 12344 times
Dear all

How can i eliminate several diversions on a river after activation of a dam because after dam construction the demands are delivered by new diversions or transmision links.

Thanks
Brian Joyce

Subject: Re: Diversion   
Posted: 5/6/2010 Viewed: 12289 times
The easiest way is to set the Maximum Flow Volume (for Transmission Links) or Maximum Diversions (for Diversions) to zero once the Dam becomes active. This will not remove the diversions from your schematic, but it will remove them from your calculations during the latter part or your simulations.

Topic "Diversion"