WEAP کی ویب سا ئٹ میں خوش آمدید
WEAP
WEAP کی شروعات کی Stockholm Environment Institute.


WEAP کےبارےميں

ابتدا
WEAP ھی کیوں؟
خدوخال
نیا کیا ھے ؟
نمونے کی سکرینیں
مظاھرہ
ایپلیکیشنز
مطبوعات
تاریخ اورکریڈٹ

WEAP کا استعمال
ڈاوٰن لوڈ
لایٰسنسنگ
رھنماے استعمال کنندہ
ٹیوٹوریل
ویڈیوز
وسائل

استعمال کنندہ کا فورم
بحث
ارکان کی فھرست
پروفائل میں تبدیلی کریں

‏اضافی خدمات
تربیت
یونیورسٹی کے مضامین
تعاون

ھمارےبارےمیں
SEI-US کا پروگرام براے آبی وسا ئل
براۓمھربانی ھمارے ساتھ رابطٰہ کریں

 ماحولیاتی خبریں
LEAP توانائ میں دلچسپی ھے؟
LEAP کے بارے میں پڑھیں: توانائ کی منصوبہ بندی کے لۓ SEI کے سافٹ وئر

استعمال کنندہ کا فورم

All Topics | Topic "Setting Supply"
Log in to post new messages or reply to existing messages.
 
Author پیغام
Janak Timilsena

Subject: Setting Supply   
Posted: 12/10/2009 Viewed: 10735 times
I have reservoir, streamflow, groundwater and desalination water as sources. I have a single demand. I would like to set the reservoir to be stored(i.e. no supply from the reservoir) during the some time of the timesteps(wet period of a year), and utlized it during another time steps.

Basically, I would like to supply water only from the groundwater, streamflow and desalination water when the reservoir is not in use. But some other timesteps, I would like to set the reservoir supply as the preferred supply of water, so that the stress on the other water uses can be reduced. Do you have any suggestion to model this thoughts?
Jack Sieber

Subject: Re: Setting Supply   
Posted: 12/10/2009 Viewed: 10734 times
I suggest setting the Supply Preference to 1 for the reservoir, and set to 2 for the groundwater, streamflow and desalination (or you could order these 2, 3 and 4 if you want), and then setting a flow restriction on the transmission link that connects the reservoir to the demand, so that the maximum flow is 0% of demand when the reservoir is not in use (which will force WEAP to use the other sources), and 100% of demand when the reservoir is in use.

Jack