WEAP वेबसाईटमा स्वागत छ
WEAP
WEAP को उत्प्रेरणा Stockholm Environment Institute.


WEAP बारे

गृह पृष्‍ठ
WEAP किन ?
अभिलक्षणहरु
नयाँ के छ ?
Screens को उधहरण
प्रस्तुति
प्रयोगहरु
प्रकाशनहरु
ईतिहास र श्रेय

WEAP को प्रयोग
डाउनलोड गर्नुहोस्
अनुमतीपत्र
प्रयोगकर्ता मार्गदर्शक
कार्यहरु
भिडियोहरु
सामाग्रीहरु

प्रयोगकर्ता सभास्थल
छलफलहरु
सदस्य सुची
Profile सम्पादन गर्नुहोस्

थप सहयोग
प्रशिक्षण
विश्वविधालय पाठ्याकमहरु
साझेदारी

हाम्रो बारे
SEI-US जल सम्पदा कार्यक्रम
कृपया हामीलाई संपर्क गर्नुहोला

 वातावरणीय समाचार
LEAP उर्जा बारे इक्छुक हुनुहुन्छ?
LEAP बारे अध्ययन गर्नुस्: उर्जा योजनाको लागि SEI को Software

प्रयोगकर्ता सभास्थल

सम्पूर्ण शिर्षकहरु | शिर्सक "Diversion"
Log in to post new messages or reply to existing messages.
 
लेखक सन्देश
Janak Timilsena

बिषय: Diversion   
Posted: 8/26/2009 हेरिएको: 11521 times
I have a reservoir d/s of diversion. is it possible to control the diversion flow based on the reservoir elevation located d/s?

Another Question: is there any way to consider biflow (between two reservoirs) depending upon the condition of one reservoir?
Samuel Sandoval

बिषय: Re: Diversion   
Posted: 9/1/2009 हेरिएको: 11515 times
> I have a reservoir d/s of diversion. is it possible to control the diversion flow based on the reservoir elevation located d/s?

Yes, you can refer to the reservoir's elevation from the previous timestep using the PrevTSValue function, e.g., PrevTSValue(Supply and Resources\River\Weaping River\Reservoirs\Central Reservoir:Storage Elevation). Then, constrain the transmission links of the diversion upstream according to the reservoir elevation, you can have a if statement such as: If( PrevTSValue(...) > 100, 100% of the demand, PrevTSValue(...) > 50, 70% of the demand, 50% of the demand)) and so on.

> Another Question: is there any way to consider biflow (between two reservoirs) depending upon the condition of one reservoir?

Yes, you can do it through a diversion link and declaring in the diversion link a "Fake Demand" You have to develop a algorithm that trigger the demand when water is necessary to be conveyed from one reservoir. The fake demand would withdraw water from one reservoir and return it all to the other reservoir.

Mehdi Mirzaee

बिषय: Re: Diversion   
Posted: 9/1/2009 हेरिएको: 11500 times
>I have a reservoir d/s of diversion. is it possible to control the diversion flow based on the reservoir elevation located d/s?

Well... It's hard to say, yes! I don't know how much information you have from LP algorithms. in LP all constraints equation solve together. It means that when LP tries to solve release from an reservoir, at the same time, diversion is solving. thus you can not make any dependency between them.
But there is some trick to define something like this to WEAP. you can make some functions in "Expression Builder"---> "Branches" and then drag and drop the reservoir. in this case you can see all characters and specifications of a dam or reservoir which is definable by a function.
My last sentence is : You can not define your aim directly, thus try to find a trick.

> is there any way to consider biflow (between two reservoirs) depending upon the condition of one reservoir?
I think that your answer was in your latter answer. you can make something in trick, too.