Bienvenue au site web de WEAP
WEAP
WEAP est une initiative de l' Stockholm Environment Institute.


A propos de WEAP

Accueil
Pourquoi WEAP?
Les caractéristiques
Quoi de neuf?
Quelques capture d'écran
Démonstration
Applications
Publications
Historique et contributions

Utilisation du WEAP
Téléchargement
Licence
Guide de l'utilisatueur
Tutoriel
Vidéos
Ressources

Forum des Utilisateurs
Voir les discussions
Liste des Utilisateurs
Modifier votre Profil

Support Additionnel
Formation
Cours Universitaires
Collaboration

A propos de nous
Programme de Ressources en Eaux du SEI US
Veuillez nous contactez

 Nouvelles environementales
LEAP Intéressé par l'Energie
Lire à propos de LEAP: Logiciels de SEI pour la plannification de l'énergie

Forum des Utilisateurs

Tous les Sujets | Sujet "Diversion"
Log in to post new messages or reply to existing messages.
 
Auteur Message
Janak Timilsena

Objet: Diversion   
Affiché: 8/26/2009 Viewed: 12465 times
I have a reservoir d/s of diversion. is it possible to control the diversion flow based on the reservoir elevation located d/s?

Another Question: is there any way to consider biflow (between two reservoirs) depending upon the condition of one reservoir?
Samuel Sandoval

Objet: Re: Diversion   
Affiché: 9/1/2009 Viewed: 12459 times
> I have a reservoir d/s of diversion. is it possible to control the diversion flow based on the reservoir elevation located d/s?

Yes, you can refer to the reservoir's elevation from the previous timestep using the PrevTSValue function, e.g., PrevTSValue(Supply and Resources\River\Weaping River\Reservoirs\Central Reservoir:Storage Elevation). Then, constrain the transmission links of the diversion upstream according to the reservoir elevation, you can have a if statement such as: If( PrevTSValue(...) > 100, 100% of the demand, PrevTSValue(...) > 50, 70% of the demand, 50% of the demand)) and so on.

> Another Question: is there any way to consider biflow (between two reservoirs) depending upon the condition of one reservoir?

Yes, you can do it through a diversion link and declaring in the diversion link a "Fake Demand" You have to develop a algorithm that trigger the demand when water is necessary to be conveyed from one reservoir. The fake demand would withdraw water from one reservoir and return it all to the other reservoir.

Mehdi Mirzaee

Objet: Re: Diversion   
Affiché: 9/1/2009 Viewed: 12444 times
>I have a reservoir d/s of diversion. is it possible to control the diversion flow based on the reservoir elevation located d/s?

Well... It's hard to say, yes! I don't know how much information you have from LP algorithms. in LP all constraints equation solve together. It means that when LP tries to solve release from an reservoir, at the same time, diversion is solving. thus you can not make any dependency between them.
But there is some trick to define something like this to WEAP. you can make some functions in "Expression Builder"---> "Branches" and then drag and drop the reservoir. in this case you can see all characters and specifications of a dam or reservoir which is definable by a function.
My last sentence is : You can not define your aim directly, thus try to find a trick.

> is there any way to consider biflow (between two reservoirs) depending upon the condition of one reservoir?
I think that your answer was in your latter answer. you can make something in trick, too.